TimberTech Advanced PVC decking—still widely known as AZEK decking—costs about $60 to $80 per square foot installed in 2026. That range covers a typical frame, premium PVC deck surface, fasteners and professional labor. A 12×12 deck therefore plans at roughly $8,650 to $11,500, while a 20×20 deck plans at about $24,000 to $32,000 before major upgrades.
The naming has changed since many older AZEK price guides were published. The AZEK Company owns TimberTech, and the PVC decking formerly marketed primarily under the AZEK name is now sold as TimberTech Advanced PVC. The current main collections are Harvest, Harvest+, Landmark and Vintage. The discontinued Arbor collection should not be used as a current-price benchmark.
In this Cost Guide
AZEK / Advanced PVC Cost at a Glance
| Cost item | 2026 planning range | What it means |
|---|---|---|
| Advanced PVC decking material | $17–$24+ per sq. ft. | Typical premium PVC board range before full framing, labor and project extras |
| Complete installed deck | $60–$80 per sq. ft. | Typical substructure, Advanced PVC boards, fasteners and professional installation |
| Complex premium project | $80+ per sq. ft. | Elevation, extensive stairs, premium railing, lighting, multiwidth patterns or difficult access |
| TimberTech composite alternative | $40–$70 per sq. ft. installed | Current Prime through Legacy wood-plastic composite collections |
The $17–$24 material figure is a planning range rather than a universal retail price. Collection, profile, color, board length, freight and dealer discounts affect it, and premium or special-order material can run higher.
Advanced PVC Deck Cost by Size
The table applies the $60–$80 national installed range to common footprints. It assumes a straightforward professionally built deck; railings, stairs, demolition, permits, electrical work and unusually costly foundations may be additional.
| Deck size | Estimated installed cost | Typical use |
|---|---|---|
| 100 sq. ft. | $6,000–$8,000 | Small landing or compact seating area |
| 144 sq. ft. (12×12) | $8,650–$11,500 | Dining table or small entertaining deck |
| 200 sq. ft. | $12,000–$16,000 | Medium single-level project |
| 300 sq. ft. | $18,000–$24,000 | Dining and lounge areas |
| 400 sq. ft. (20×20) | $24,000–$32,000 | Large premium outdoor living area |
Current TimberTech Advanced PVC Collections
| Collection | Price position | Best reason to consider it |
|---|---|---|
| Harvest | Entry-priced | The entry point to the current Advanced PVC family with a cleaner, traditional visual direction |
| Harvest+ | Mid-premium | A step up within the Harvest family with additional aesthetic options |
| Landmark | Premium | Premium reclaimed-wood character and pronounced color variation |
| Vintage | Premium | Flagship appearance, broad design options and premium color/grain treatment |
TimberTech also offers porch, dock/waterfront and multiwidth applications within its broader Advanced PVC catalog. Not every collection, width, color or profile is stocked in every market, so the final specification should be confirmed before design drawings and material takeoffs are completed.
What Happened to AZEK Arbor?
Arbor appears in many older cost tables but is not part of the current main collection list. Homeowners matching an existing installation may still encounter leftover inventory or replacement discussions, but Arbor should not be presented as a normal 2026 choice. Match existing boards by product identification and actual sample, not by an old online photograph.
Current Warranty Position
TimberTech currently presents Harvest+, Landmark and Vintage with a limited lifetime product warranty and 50-year fade-and-stain limited warranty for residential applications. Current terms, registration, exclusions, transfer provisions and any collection-specific differences control. Ask the dealer to put the exact product and applicable warranty document on the order.
Why Advanced PVC Costs More
Advanced PVC is TimberTech’s premium decking category. The boards contain no wood fiber, use complex surface and color treatments, and are positioned with the brand’s longest warranty coverage. The material price is higher than entry composite, and premium projects often add matching fascia, hidden fasteners, multiwidth layouts and higher-end railing.
Cost should be evaluated across the complete project rather than justified by a single feature. A durable surface still depends on a correctly designed frame, sound ledger connection, suitable fasteners, good drainage and workmanship.
What Changes the Installed Price?
Collection, Width and Pattern
Harvest is positioned below Landmark and Vintage, but color and local availability affect real dealer pricing. Multiwidth patterns can create a distinctive floor-like design and may also increase planning time, cuts and waste. Picture-frame borders and breaker boards require additional square-edge material and blocking.
Substructure and Foundations
Footings, posts, beams and joists frequently make up a larger share of the project than homeowners expect. A tall deck, difficult soil, long spans, complex ledger conditions or steel framing raises the price. Existing framing should be inspected before any resurfacing estimate is accepted.
Railing and Stairs
Premium railing can add thousands of dollars because it is priced by linear foot and involves posts, hardware, infill, gates and labor. Stairs require extra framing, treads, risers, landings and code-compliant guards. Use our deck railing cost guide for a separate allowance.
Labor and Access
Local wage rates, permit requirements and seasonal demand affect labor. Restricted access, steep terrain, landscaping protection, material staging and hand-carry distances all increase crew time.
Removal and Disposal
Removing an old deck adds labor, hauling and disposal fees. If only the surface is replaced, hidden rot, corroded fasteners, inadequate joist spacing or poor ledger attachment can still expand the scope after inspection.
Advanced PVC Versus TimberTech Composite
Advanced PVC contains no wood fiber. TimberTech composite combines wood fiber with synthetic material and offers a wider range of price points. PVC is especially attractive where moisture exposure, low water absorption and premium warranty positioning matter; composite is often the more economical route to a low-maintenance deck.
The two categories also feel and sound different underfoot. Color, texture, board profile, thermal movement and fastening details vary. Compare full-size samples outdoors and have the contractor explain any framing or installation difference. See the separate TimberTech composite decking cost guide for Prime through Legacy pricing.
Advanced PVC Versus Trex
Trex decking is primarily composite across its mainstream collections, with Refuge as a specialist PVC product. TimberTech offers a larger named Advanced PVC family. A fair comparison should match similar visual and warranty tiers and include the entire installed scope—not just a per-board retail price.
Local availability matters. A product with reliable dealer stock, trained installers and accessible matching fascia may be a better project choice than a slightly cheaper board requiring long freight or special orders.
Installation Details That Protect the Investment
- Use the current installation guide. PVC expands and contracts with temperature, so gapping and fastening must follow the product-specific tables.
- Confirm joist spacing. Standard deck fields, stairs, diagonal layouts and special applications may require different support.
- Plan borders before framing. Picture frames, multiwidth designs and breaker boards need the right blocking and board profiles.
- Manage drainage. Water should move away from the building and should not remain trapped against framing.
- Use approved fasteners. The chosen grooved or square-shoulder profile determines fastening and edge treatment.
A premium surface cannot correct an unsafe frame. Resurfacing quotes should document the condition of footings, posts, beams, joists, ledger and connectors before the old boards are covered.
Cleaning, Heat and Weather
Advanced PVC does not need routine staining or sealing. Sweep away debris and follow TimberTech’s current care instructions for ordinary dirt, food, grease, mold on surface contamination or ice-removal products. Do not assume a cleaner or solvent safe for wood is suitable for PVC.
Decking can become hot in direct sunlight. Surface temperature depends on color, exposure, air temperature and airflow. TimberTech markets Advanced PVC for improved heat performance relative to many competitive composite boards, but no dark outdoor walking surface remains cool in all summer conditions. Test samples at the site and plan shade where barefoot use is important.
Slip conditions also vary. Water, ice, algae, pollen, leaves and grease can reduce traction on any deck. Good drainage, timely cleaning and appropriate footwear remain necessary.
Is AZEK / Advanced PVC Worth It?
The premium can make sense for homeowners prioritizing low water absorption, sophisticated appearance, broad design options and long warranty positioning. It is harder to justify when the lowest initial cost is the deciding factor or when a mid-priced composite already satisfies the project’s needs.
Ask for an itemized quote naming the collection, color, widths, profiles, fasteners, framing, railing, stairs, fascia, permits, demolition and cleanup. Compare the contractor’s workmanship warranty separately from the product warranty.
Advanced PVC Cost FAQs
Is AZEK decking now called TimberTech?
Yes. The AZEK Company owns TimberTech, and the PVC decking many homeowners know as AZEK is now marketed as TimberTech Advanced PVC. “AZEK decking cost” remains a useful search term, but the current collection names should appear on the quote.
How much does a 12×12 AZEK deck cost?
A straightforward 144-square-foot Advanced PVC deck plans at approximately $8,650 to $11,500 installed. Railing, stairs, demolition and elevation can raise the total.
How much does a 20×20 AZEK deck cost?
A 400-square-foot project plans at roughly $24,000 to $32,000 installed using the national $60–$80 range.
Does Advanced PVC need to be stained?
No. It is not maintained like wood and should not be routinely stained or sealed. Use the manufacturer’s approved cleaning methods.
How long does Advanced PVC decking last?
A correctly installed and maintained PVC surface is designed for long service, but no fixed lifespan applies to every site. Structure, exposure, installation, use and care all matter. The warranty is coverage under stated terms, not a promise that every component of the deck will last for the same period.
Sources and Cost Methodology
Reviewed September 2026. We use current TimberTech product and warranty information to identify today’s collections and separate PVC from composite. We then compare published national installed-cost data with project-size calculations. The result is an editorial planning range rather than a copied supplier price list. Learn more about how we research deck costs.